2026 Citywide Pavement Rehabilitation Project
Scope
The 2026 Citywide Pavement Rehabilitation Project includes full depth reclamation with cement (FDR-C), hot mix asphalt, Type 3 micro surface leveling course with fibers, asphalt rubber (PMAR) chip seal, Type 2 micro surface, asphalt treatments in a three-layer system, HMA removal and replacement, digouts, and striping in City of Benicia Pavement Zones 6 and 17, Cambridge Drive between Rose Drive and Hastings Drive, and Rose Drive between Columbus Parkway and Bolton Circle. Additional work includes removal and installation of hot mix asphalt concrete, curb, gutter, sidewalk, curb ramps with warning surfaces, crosswalks, signing and striping at various locations within the Pavement Zones.
Contract Approval Date by Benicia City Council
June 16, 2026
Tentative Project Schedule
The work began in July 2026 and is anticipated to be completed in October 2026.
Construction Cost
$5,283,795
Funding Source
Gas Tax, Solid Waste Vehicle Impact Fee, and Measure F
Contractor
Team Ghilotti Inc.
Construction Hours
Monday - Friday: 7:00 AM - 4:00 PM
Potential Resident Impact
Expect street closures and detours during pavement rehabilitation activities.
Project Contact
Derek Linsley
City of Benicia
Senior Civil Engineer
dlinsley@ci.benicia.ca.us
Updates
Microsurface Schedule:
Monday, October 12:
- Cambridge Drive from Hastings to Cooper
- Baylor Court from Cambridge to End
- Winston Court from Cambridge to End
- Devonshire Drive from Hastings to 2nd Driveway
Tuesday, October 13:
- Devonshire Drive from Southampton to Stuart
- London Circle from Midpoint to End
- Cooper Drive from Cambridge to End
- Chery Drive from Anita to Drolette
Wednesday, October 14:
- Capitol Drive from Cooper to Cambridge
- Anita Circle from Cheryl to Cheryl
- George Court from Cheryl to End
Thursday, October 15:
- Cheryl from W 7th to Charmian
- Landahl from Drolette to End
- Fry from Drolette to End
- Drolette from Cheryl to End
- Capitol from Hastings to Cooper
Friday, October 16:
- Cooper from Cambridge to Capitol
- Byron Court from Cooper to End
- Sargent from Cooper to End
- Rose from Cambridge to Columbus
Monday, October 19:
- Cambridge from Cooper to Capitol
- Drolette from Military to Cheryl
- Goettel from Drolette to End
- Corrigan from Drolette to End
- Construction will take place between 8:00 AM - 5:00 PM
- Roads will be closed for a period of 4 hours after the treatment is applied to allow the material to cure
- Portions of the roadway including driveway access may be temporarily limited while sealant cures
- Please adhere to NO PARKING and ROAD CLOSED signs
Public notices are posted on the Contractor's webpage: https://teamghilotti.com/public-notices/.
