We encourage you to use the information on this page in planning your site development or construction project. Early coordination helps to determine whether permits, plans, inspections, or additional approvals are required and can prevent delays during construction. Reviewing the information on this page before beginning design or construction will help understand the City's requirements and ensure the project moves forward safety, efficiently, and in compliance with applicable regulations.
- Determine if your project will require grading, erosion sediment control or stormwater management measures.
- Is the project outside the existing building footprint?
- Are there any earth disturbances that modify existing topography, including excavation, filling, or clearing, specifically if it involves significant earth movement or occurs within regulated areas? If so, how many cubic yards?
- Are active construction activities anticipated between October to April?
- Do I need a building permit?
- Do I need any land use approvals (e.g., design review, use permit, etc.)?
- Will the project add new surfaces that do not absorb water, such as buildings, driveways, or pavement?
- Learn what to expect:
- Learn about the permit process and fees at www.GoBenicia.org.
- Prepare for permitting:
- Hiring a Design Professional: Architect, Landscape Architect, Professional Engineer/Surveyors
- Hiring a contractor
- Seek guidance if you have questions
- Grading Permit:
- Apply through the online Permit Center
- Construction:
- Pre-Construction: Ensure all required permits are issued and any required pre-construction inspections are completed prior to the start of grading or earth-disturbing activities. Required stormwater, erosion, and sediment control measures must be installed before construction begins.
- Construction Hours: Ensure the project adheres to the City’s permitted construction hours. See section below for hours.
- Erosion and Sediment Control: Maintain all approved erosion and sediment control measures and stormwater Best Management Practices (BMPs) throughout construction to prevent sediment discharge and protect the storm drain system.
Inspections: Schedule and complete all required inspections for the permitted scope of work at the appropriate stages of construction.
Development Engineering staff can be contacted via email at developmentengineering@ci.benicia.ca.us or by phone at 707-746-4210.