Army Corps of Engineers Reports - Part One
What follows below is a list of documents which provide a general overview and historical context. Following these documents there is a link to further Army Corp of Engineers Reports.
Records Research Report (April 1999): (produced by Jacobs Engineering for USACE)
August 1999
- Field Site Investigation Plan 50 Series Complex (Area I Workshop Facilities and Surrounding Structures at Buildings 56-59, 65 and 66)
June 2000
- Technical Memorandum
- Field Site Investigations (Area I Fuel Facilities, Buildings 53, 73, 103 and 154)
- Appendices A-B
- Appendices C-D
- Appendix E
- Appendices G-H
January 2001
- Final Field Site Investigation Plan (Area I Landfills 1 & 2, Quarry 3 and Area M Quarry 1)
March 2004
- Final Preliminary Assessment Report
- Appendix A: Area W, Area I ( 1, 2, 3), Area R, Area M ( 1, 2), Area S
- Appendix B
- Appendix C ( 1, 2, 3)
April 2004
- Expanded Site Inspection Field Site Investigation Plan
- Appendices: A, B, and C
October 2004
Area I 50 Series Complex Site Investigation Report
- Table of Contents - Section 4.0
- Sections 5.0-10.0
- Appendices A-D, E-I, J1, J2, J3, J4, J5, K-M
September 2005
- Expand Site Inspection Report
- Section 6
- Appendices A , B , C , D1 , D2 , D3 , E , F , G ,H , I , J , K , L
- Soil Gas Hits Report
- Soil Hits Report
- Water Hits Report
June 2006
July 2008
Army Corps of Engineers Reports - Part Two