Records Research Report 1999 - Volume 3

Prepared for the US Army Corp of Engineering, produced by Jacobs Engineering in April 1999. Volume 3 of 4.
Appendix C-1 List of Historical Drawings from Benicia Arsenal
01-302NPRC General Layout Covered Area Building
02-304NPRC Covered Area South End of Dynamometer Room - Building #31
03-306NPRC Repairs to Existing Sorm Sewer System
04-309NPRC Area 9-A to be paved between Buildings #4 and 165
05-316NPRC Sawdust Disposal System-West of Carpenter Shop
06-318NPRC Lab & Electroplating Facilities in Building 120
07-357 Topography Between Arsenal & Lake Herman Reservior
08-359 Explosives Holding Yard General Plan 1
09-360 Explosives Holding Yard General Plan 2
10-361 Explosives Holding Yard General Plan 3
11-373CE Supplemental Master Plan General Real Estate Plan for Proposed Benicia-Martinez Bridge
12-376CE Sectional Plan General Roads Railroads Structure
13-381CE Gasoline Storage Tank for Dynamometer Shop
14-385 Alterations & Additions to Existing Bulding #49
15-388CE Enclosed Shed at Building 51 Foundation & Painting
16-390CE Fuel Storage Installation Dynamometer Shop
17-392CE Layout - Buildings 48, 99, 99A
18-394CE Hard Standing Between Projects S & Yuba Manufacturing Sewer Outlets Details
19-397CE Proposed Lumber Storage Area
20-603CE Rehabilitate TO73 for Depot Facilities Shop
21-604CE Install Sanitary Sewer from CL1 to Pumphouse
22-605CE Rehabilitation of Building CL1 Plot Plan & Vicinity Map
23-606CE Preliminary Layout Nike Overhaul Project
24-608CE Additional Facilities Utilities & Electrical Work
25-609CE Additional Facilities Mechanical Plan
26-612CE Service Pit in Paint Booth in Building #161
27-613CE Reclamation Building Mechanical Work
28-614CE Reclamation Building Utilities Plan
29-619CE Battery Charging Building Elevators & Details
30-622CE Additional Gasoline Storage Tank for Engine Test Stands
31-623CE Relocation of Red Gasoline System
32-624CE White Gasoline Storage Tank for Test Stands
33-625 Proposed Locomotive House
34-627CE Tank for Power Train Rebuild
35-628CE Power Load & Paint Booth for Power Train Rebuild at Building 91 Annex
36-632CE Grading & Paving Layout for One Warehouse
37-635CE Army Point Pumping Plant-Gate Valve Numbers
38-636CE General Utility Map Sanitary Sewer
39-637CE General Storm Drainage Map
40-643CE Basic Information Maps Detail Site Plans & Building Use Maps Sectional
41-646CE General Map
42-650 CE Numbering of Road System
43-651 Benicia Ordnance Depot General Map
44-652 Infirmary
45-653 Map of Benicia Arsenal Reservation
46-654 Map of Arsenal 1894